Looking for something to do?

There are a number of additional jobs that we can tackle at the work party on Saturday. Here are a few of them, in case you have some preferences.

Remove Motor and Controls and other items from the “Arthur” We will be either putting them on “ARBY SEA” or on a different work boat.

Pick up old lumber and junk and pile so it can be loaded and taken to dump.

Bring walk way to Dinghy docks up and set on slides

Stow all bouys, including Dragon Boat and No Wake (someone needs to repair this one)

Clean up new floats for Gallows (see Scott for directions on this)

Make sure all electrical boxes are in good repair and covered for the winter

Check Current on Power lines to boats to make sure it is minimum.

Make sure parking lot is clear and ready for plowing

Put marker posts around masts to prevent damage from plow.

About Eric Phinney

Past Commodore Renforth Boat Club Rector of Renforth (St. James the Less Church)
This entry was posted in General, Yard. Bookmark the permalink.