Harbourmasters report Sept 20 2011

All moorings have had a position check. Info will be updated on the individuals personal profile on the website IE position description condition recommendations.
If you used chain this year and have not been charged for it please advise the treasurer.
Winterizing moorings should take place after boats are all out. If you do decide to winterized early please mark your line with a jug until the rest of the boats are out.
Dates should be set for haulouts: power and sail and docks.
Particular attention should be paid to the weather at this time of year. You may not want to leave your dinghy at the dock if you are not using it atleast once a week.
The blocks for the dinghy docks need gps locations.
All dragon boat markers except the start buoy have been removed. There is one on the beach that still needs to be stored.
The no wake buoy still needs to be painted
Paving is supposed to take place this week. Call in to Charles Jensen.

About Eric Phinney

Past Commodore Renforth Boat Club Rector of Renforth (St. James the Less Church)
This entry was posted in Harbour. Bookmark the permalink.